Towing Manual Development
Manual contents :
- Towing line calculation and analysis of compliance of the towing vessel
- Analysis of towing/passage route, taking into consideration navigation, hydro-meteorological and operational restrictions;
- Draft and air draught monitoring within the towing/passage route;
- Ballast calculation while navigating in various legs of the towing/passage route
- Measures for preparation and conversion of the object being towed/in transit;
- Measures to ensure safety in the course of towing/passage
Projects of towing/passage of objects:
- in sea areas outside the prescribed restrictions;
- for ships that lost their classification society class;
- for ships, technical condition of which does not meet the IMO or class requirements;
- for navigation via inland waterways outside the prescribed navigation area or season restrictions in compliance with the RRR requirements.